link2 face2 twit2             

CM SOLUTIONS CLIENT LIST

OUR CLIENTS 
Anglo American Logiman 
Anglo American Platinum Lonmin 
Anglo Base Lonmin Platinum
Anglo Platinum Metals Finance Africa 
AngloGold Ashanti Metorex
Boss Mining Rand Refineries
Chambishi Metals SMP 
ENRC SNC Lavalin
Hindustan Zinc TWP / Chambishi 
Impala Platinum TWP / Meta Mining 
Read 4626 times

Current and Recently Completed Projects

 

Process engineering study with options for a platinum refinery

Our brief was to develop the flowsheets and mass balances (metal recoveries and volumes), and calculate the capital and operating costs for five different flowsheet options for a platinum-group metals refinery. The client was under pressure, and the project was completed in record time.


Zinc recovery improvement on a flotation plant

Our brief was to improve the recovery of zinc on a plant. We used our methodology based on the theory of constraints to determine the best course of action, and achieved a measureable improvement in recovery by using a combination of control and process changes.


Blast optimisation study

Our brief was to develop a methodology for blast optimisation, which is also called mine-to-mill optimization. We surveyed previous case studies, distilled the essential steps and recommended the required methodology.

 

CLICK HERE FOR MORE

CM Solutions on twitter

Our Partners